Rotorway 1990 Exec 152 upgraded to Exec 162 specs,.. Full logs (this is a show machine with over 20.



Item specifics
Condition: Used Make: Rotorway
Model Year: 1990
Exec 152 upgraded to Exec 162 specs,.. Full logs (this is a show machine with over 20 awards) Custom paint on the heli and blades. A full set of landing gear skirts included painted to match. Aluminum is all polished, Engine has 90 hours since complete overhaul done at Rotorway. Complete new dual electronic ignition, alt, water pump upgrades, Total time 252 hours on this machine. Has new upgrade 1 ¾” shaft complete setup with new elastomeric bearings and cables, new fuel line, new cog belt, drive belt and tail belts with 3 hours since installed, Pro drive cog belt secondary, Electric clutch engagement, Larger upgraded surface area tail blades, Full 162 interior, heat box with heat controls, trt-250 with trans-cal d120 Transponder, King ky97a vhf comm transceiver, dual controls, new battery, full lighting, strobe, landing lights, engine is tuned and smooth, machine is fully balanced and tracked. Has custom built box for storing and transporting main blades to shows. Ground handling wheels.
I keep getting 20 questions a day on this helicopter but only a couple guys ask the right questions. If you’re looking at a Rotorway Exec the main questions you really want to ask. It is mag or electronic ignition? Avoid mag. Electronic is a $4000 upgrade Min shaft size. 1 ½” or 1 ¾”? Avoid 1 ½”…. 1 ¾” is a $8000 upgrade Chain or cog belt drive? Avoid chain. Leaks all the time and all over things. Cog belt $3000 upgrade Elastomeric bearings? Time and conditions. They cost $550 each so make sure their new. Blade brand? Make sure it’s Rotorway. Main shaft bearings. Make sure their upgraded to larger bearings $1000 upgrade . Drive clutch. Ask if it’s manual or electronic. Electronic is a $3000 upgrade. Alternator stock or updated? Alt update is $600 Set up with forward and aft ballast weight or not? Tail blades stock or updated with wider more efficient blades? $2000 upgrade. Stock or upgraded seat package? Main drive belts new? Tail belts new? Water pump belt new? Alternator belt new? Fan belt new? If it’s cog belt is it new? Avionics? Transponder, encoder, antenna’s. You can be talking about several thousands of dollars here. Secondary drive size? Upgrade is $2500
This machine is as nice as they come.
217 242 9930 if interested.
Payment is cash, wire or verified cashier’s check. Please do not bid if you are not in the USA or you do not have funds lined up ahead of time. Every time you see one of these advertised you see will need belts and hoses and so on. If you’ve never built or worked on one of these installing and setting up main drive belts or installing a cog belt drive, upgraded main shaft correctly is a serious job and very costly. I’m posting to explain some of the maintenance and upgrades I have completed within the last 5 hours.. Wiring harness upgrade was complete removed and installed with 162 harness. The fuel systems I removed the tanks installed new fuel regulator, fuel lines, fuel filter, tested pumps and fuel gauge for proper function. Removed main shaft and replaced lower and upper bearings with 1 ¾” setup, Replaced 6 drive belts set and aligned to Rotorway spec. Replaced fan bearings and drive belt. Replaced alt belt. Removed tail belts and inspected every part. Replaced all tail drive belts. Installed new 1 ¾’ main shaft set from Rotorway along with new cog belt then adjusted and aligned for proper operation. Installed new elastomeric bearings, rotor tach pickup. Adjusted plus and minus pitch per Rotorway spec. Blades were rebalanced and aligned with mew strap bolts installed. Cyclic throw was set per Rotorway spec along with collective range. Electric clutch engagement was adjusted for proper drive belt tension when actuated. Oil and antifreeze was then changed. New spark plugs installed. New battery installed. I’ve then started and ran the heli for 30 minutes stopping to check and reset belt tension and alignment. I did this every 30 minutes for 5 hours unit the tension and alignment was perfect and belts were broken in. I started at the tail and went to the front inspecting every nut, bolt and rivet for proper instillation. Last pictures shows machine during upgrades.
Current date: 2015-12-29